Engineered industrial mezzanine platforms for Singapore warehouses, factories and logistics operators. PE-stamped structural calculations, BCA / SCDF submission coordination, stair-handrail-gate works — all delivered as one quotation. Built around your existing operations, not the other way round.
"We measured at 5.4 m clear height. Plenty for a mezzanine, the consultant said. Six months later we discovered the sprinkler heads were 4.8 m and the BCA plan had to be redrawn."
Most failed mezzanine projects don't fail because of the steel. They fail because somebody surveyed the clear height with a tape measure pointed at the ceiling, not at the sprinkler heads. Or because the submission was started after fabrication, not before. Or because the load rating got rounded up to "industrial-grade" without a sit-down about what is actually getting stored on it.
We are a mezzanine specialist rather than a general steel fabricator. We start with the regulatory envelope (BCA permissible area, SCDF egress, sprinkler requirements, gas detection where relevant), then size the mezzanine inside that envelope. PE-stamped calculations, BCA submission, SCDF coordination, structural fabrication, decking, stairs, gates, handrails — one quotation, one accountable team.
We also know when a mezzanine is not the right answer — sometimes the right answer is VNA conversion, sometimes it's a Drive-In rack swap-out, sometimes it's a slab reinforcement before anything goes up. We tell you that before quoting.
A mezzanine is more than the deck. It's the slab connection, the column spacing, the stair geometry, the load case, the fire compartmentation, and the submission paperwork. We deliver the lot.
The most common use case. Mezzanine above pick face for bulk reserve, or as a second working level for case picking. Typical load rating 500 kg/m² for pallet storage above, 350 kg/m² for cartons. Steel decking with optional concrete topping for sound dampening.
Light manufacturing, assembly, packing operations on a raised level. Load rating typically 250–350 kg/m². Anti-vibration deck for sensitive operations. Compatible with conveyor handoffs to ground level via chute or lift.
Mezzanine that uses pallet racking uprights as its supporting columns. Saves floor space below and integrates storage with workspace. Load engineering is more complex because the racks carry both pallet load and mezzanine load simultaneously — we design both as one system.
Office space above the warehouse floor. Lower load rating (200 kg/m²) but stricter on partitioning, acoustic decking, and HVAC integration. Often paired with an internal staircase, glazing balustrade, and partition walls for meeting rooms.
Engineered for forklift drive-on access — pallet trucks, walk-behind stackers, or full counterbalance forklifts on smaller mezzanines. Heavier deck, denser joists, reinforced columns, stricter slab fixings. We engineer to the actual forklift class.
PE-stamped structural calculations, BCA endorsement, SCDF fire-safety plan, smoke detection layout, sprinkler tap-off coordination, egress staircase calculation, Certificate of Occupancy (CO) coordination. Handled as part of one mezzanine quotation, never as a separate consultancy.
Hot-rolled UC / UB or square hollow sections. Sized to actual load case + safety factor. Base plates engineered to slab capacity, not generic spec.
22 mm Particleboard, chequer-plate steel, composite deck with concrete topping, or open-grate for sprinklered floors. Picked per use case.
Steel staircase with non-slip treads, handrails to BS / SS standards, kickplates, pallet gates for loading (swing, sliding, or up-and-over).
PE-stamped structural calculation, BCA endorsement, SCDF fire plan. Handled by our in-house team — no consultant hand-off.
A standard mezzanine project moves through six stages. BCA-endorsed projects add 4–8 weeks for submission turnaround.
Clear height under obstructions (sprinkler heads, beams, lights), slab capacity, column placement constraints, fit-out integration, regulatory envelope.
Column grid layout, beam sizing, deck specification, stair geometry, load case design, PE-stamped structural calculation.
Where required: BCA endorsement, SCDF fire-safety plan, sprinkler tap-off coordination, egress calculation. 4–8 weeks turnaround.
Columns, beams, joists, stairs and handrails fabricated in our Singapore workshop. Powder-coat finish. Decking material procured in parallel.
Site delivery, slab marking, column installation with thickness-checked base plates, beam erection, joist install, decking, stair, handrail, gate.
Load test, snag list, PE walk-through, BCA / SCDF final endorsement, Certificate of Occupancy coordination, client handover with as-built drawings.
When BCA submission is required: mezzanines above approximately 300 m² gross floor area, mezzanines carrying assembly use, mezzanines used for any public-facing function, and any mezzanine that changes the building's GFA balance. Industrial storage mezzanines below 300 m² in a single-occupant industrial unit often don't require submission — but we always check the specific URA plot record first.
When SCDF submission is required: any mezzanine that affects the fire compartmentation strategy of the unit, mezzanines requiring sprinkler tap-offs, mezzanines that change egress paths, and mezzanines above 300 m² gross. SCDF fire-safety plan is typically reviewed in parallel with BCA submission.
Sprinkler coordination: if your unit is sprinklered and the mezzanine creates an obstructed sprinkler zone above the deck, additional sprinkler heads must be installed below the deck. This adds cost and timeline. We coordinate with your sprinkler contractor or include this scope in our quotation.
Smoke detection: SCDF generally requires smoke detection on the mezzanine level if the deck is above ~3 m. We specify and install where part of our scope.
Egress staircase calculation: mezzanine egress is sized to the occupant load. A 400 m² mezzanine for 20 occupants may need only one stair; the same area for 80 occupants requires two stairs at opposite ends. We calculate and place to SCDF code.
Tell us your warehouse clear height, intended use, occupant load, and whether you're already sprinklered. We come and survey, then quote with BCA / SCDF scope included.