Site survey, design, fabrication, installation, BCA / SCDF submission, SS EN 15635 rack inspection, decommissioning and reinstall — one accountable team, one quotation, one work order. The full service stack from a Singapore racking manufacturer.
"We were quoted by three companies — one for racks, one for the mezzanine, one for the BCA submission. Three months in, none of them would talk to each other about the rack-supported platform interface."
This is the most common reason racking and mezzanine projects in Singapore go sideways. Multiple separate vendors with separate quotations, separate scopes, and separate excuses when the rack-mezzanine interface doesn't line up. The client ends up being the integrator — without the engineering background.
We work the opposite way. One quotation covers site survey, layout design, fabrication, installation, BCA / SCDF submission, and final commissioning. One team is accountable from first phone call to final sign-off. We don't sub-let, we don't pass scope between sub-contractors, and we don't tell you "that's not in our scope" half-way through.
This page lists every service we deliver. Read what fits your project; message us with what you need.
Everything below is delivered in-house. The person who quotes is the person on site. The submission engineer is in the next room. The fabrication workshop is ours.
Physical measurement of floor footprint, ceiling clear height, slab joints, sprinkler heads, beam soffits, lighting and HVAC obstructions. Forklift fleet audit (counterbalance vs reach vs VNA), SKU and pallet mix review, weight profiling. The honest constraints emerge here.
CAD layout with bay-by-bay pallet positions, beam load tables, aisle widths and forklift traffic patterns. 3D rendering for client review of clearances and traffic flow. We show the trade-offs (density vs selectivity, capex vs ROI) before steel is cut.
Selective, Double-Deep, Drive-In, VNA, Cantilever and our V-series Heavy-Duty range (V3000, V5000, V6000, V8000, V10000) covering 3,000 to 10,000+ kg per beam level. Full system catalogue →
Industrial mezzanines from 100 to 5,000 m². Pure structural mezzanines, rack-supported platforms (where pallet racks carry the deck above), and forklift-accessible mezzanines. Engineered to actual planned use case. Mezzanine specialist →
PE-stamped structural calculations for mezzanines, PE-stamped racks above height thresholds, BCA endorsement, SCDF fire-safety plan, sprinkler tap-off coordination, smoke detection layout, egress calculation, Certificate of Occupancy coordination.
Annual or post-incident inspection of existing racking under SS EN 15635 principles. Plumbness, impact damage, safety pins, beam deflection, base-plate fixings. Written report with green/amber/red triage and remediation cost estimates.
Site delivery, floor-fix per load calculation, level shimming, beam installation, safety-pin engagement, anti-collision posts where forklift paths demand. Sign-off load test before handover. No sub-let, no day-labour shortcuts.
Disassembly of existing racking at end-of-lease, careful packing, transport, and reinstallation at the new warehouse. Salvage assessment with green/amber/red categorisation of recovered components. Quotation separately for new components needed to make recovered system safe.
Steel shelters, canopies, ancillary structures for industrial yards, loading bays and outdoor storage. Same fabrication standards as the indoor racking. Galvanised finish for outdoor service life.
Standard installations run 4–6 weeks. Mezzanine with BCA submission adds 4–8 weeks. Add more for site-specific complications like sprinkler reconfig or slab reinforcement.
We come and measure. SKU audit, slab check, forklift radius logging, regulatory envelope. Free of charge for serious enquiries.
2D / 3D layout. Bay-by-bay loading. Load case calculation. Written quotation with itemised pricing. Submission scope included if needed.
In our Singapore workshop. Cold-roll forming, beam end-plates, upright frames, accessories. Powder-coat finish. PSB-tested.
Floor-fix, beam erection, accessory install, safety-pin check, load test. Final BCA / SCDF endorsement closed out before handover.
Our billing structure mirrors the Wong Lye family standard: typically 5–10% deposit on signing, balance tied to verifiable job completion milestones. You can stop work at any point and pay only for what's done. We use the same model on landed building works (sister company wonglye.com) and renovation (contractors.com.sg).
Typical milestone schedule for a 4–6 week racking install:
For mezzanine projects with BCA submission, the schedule shifts slightly: a portion of the 30% fabrication milestone moves to a "submission accepted" trigger so you don't pay for fabrication of a non-approvable design.
Tell us what you're trying to solve. We come and look, audit honestly, and quote properly. No catalogue spam, no middleman, no surprise final invoice.
Speak to Wong Lye on WhatsApp